top of page

Week Sixteen – Wednesday

Writer: undefined

The flooring guys

The flooring guys


The floorboards are almost finished. We used 4″ x 5/8″ western red cedar screwed to white oak battens. Each of the sections will be removable so the bottom of the boat can be sponged dry.


Western red cedar floorboards

Western red cedar floorboards


The trailer assembly was completed today enabling us to move the boat from the building frame onto the trailer. The transfer was very easy with the shop’s overhead track and hoists.


Final assembly of the trailer

Final assembly of the trailer



Boat suspended in slings awaiting the trailer

Boat suspended in slings awaiting the trailer



Trailer and boat meet

Trailer and boat meet


 
 

Comments


CountyCoastalRowing.org

©2025 Ayle of Quinte Skiff Club

bottom of page