The flooring guys
The floorboards are almost finished. We used 4″ x 5/8″ western red cedar screwed to white oak battens. Each of the sections will be removable so the bottom of the boat can be sponged dry.
Western red cedar floorboards
The trailer assembly was completed today enabling us to move the boat from the building frame onto the trailer. The transfer was very easy with the shop’s overhead track and hoists.
Final assembly of the trailer
Boat suspended in slings awaiting the trailer
Trailer and boat meet
Bình luận